Some shingle manufacturers recommend these precautions on roofs with slopes as shallow as Evan Gillespie grew up working in his family's hardware and home-improvement business and is an experienced gardener. He has been writing on home, garden and design topics since By Evan Gillespie. Related Articles. Starter Course The starter course is the first row of shingles that you'll install along the eaves of the roof. Offsetting Shingles Offsetting each successive course horizontally by 6 inches from the course below it will make the cutout gaps between the tabs of a standard shingle line up with the middle of the tabs of the shingles above it.
Insert one galvanized nail every 6 inches in the designated nailing zone. Position the second shingle above the first shingle, pushing it to the left a few inches until the right edge of the new shingle lines up with the first notch on the shingle below. Align the bottom of the shingle with the lap line on the first shingle.
The new shingle will extend a few inches off the left edge of the roof. Nail every 6 inches in the nailing zone. Cut off the excess shingle at the roof edge. Repeat the process with the third, fourth and fifth courses, each time, aligning the new shingle with the notch on the shingle below. This creates the stair-step pattern and now you can start laying full shingles to the right of each shingle in the pattern.
Continue laying full-length shingles. The only cuts necessary will be at the left and right edges to trim away excess. Use special asphalt ridge shingles at the top of the roof after shingling both sides in a stair-step pattern. These shingles are approximately inch square. Place a double shingle at each end, with the tar strip running vertically on each side of the roof.
Install each additional ridge shingle over the previous one, using the lap line as a guide. Can you put shingles over rolled roofing? What is the minimum pitch for roll roofing? Sep 17, Do you need drip edge on rolled roofing? Drip edge, or drip cap, is either plastic or sheet metal. It not only protects the roof, but it also protects the fascia and the siding from water seepage. Install roll roofing when the temperature is at least 50 degrees Fahrenheit to keep the material from cracking.
READ: why did anne dudek leave house. The best way is to install the roof drip edge only along the eaves first , then place ice-and-water barrier in the snowbelt or felt paper underlayment over the drip edge. This lets any water that gets on the roof run down the underlayment and over the drip edge.
Should drip edge be tight to fascia? It depends on where the drip edge is. At the side, or gabels, of a roof, the drip edge goes over the roofing felt. At the bottom of the roof, the drip edge goes under the roofing felt. When should I replace my rolled roof? How do you remove old rolled roofing? How to Remove Rolled Roofing. Contact your local waste management company to have a dumpster delivered to your house. READ: how to say decide in spanish. Is it OK for roofing felt to get wet?
How many layers of shingles can you put on a roof? Dec 18, How much do you overlap rolled roofing? What type of roofing is best for a low pitch roof? Metal roofing systems are popular because of their longevity and durability. Rubber roofs are a top choice for flat or low pitched roofing as it adheres to the roofing materials below it and, when installed correctly, provides a watertight seal to the elements. What kind of roof do I need for a 2 12 pitch?
Resilient asphalt shingles lie much flatter to the substrate than slate, tile and concrete, which keeps water from being easily blown under them.
How do you install GAF mineral guard roll roofing? How do you install rolled roofing nails?
0コメント